Case Study - Dundonnell Wind Farm

Case Study - Dundonnell Wind Farm
Case Study - Dundonnell Wind Farm
24 FEB 2020

Use case of Dura-Base composite matting at Dundonnell Wind Farm construction site.

Check out the latest case study below - how composite matting was used to support the construction of a new substation and 38km of transmission line works for Dundonnell Wind Farm.

Case Study - Dundonnell Wind Farm

Social MediaSHARE
Back To News

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto