The Dundonnell Wind Farm Project is a $560M development with the capacity to generate 336MW and estimated to power 245,000 Victorian households per year.
Located 23km north-east of Mortlake, Victoria, the project is set to erect 80 Vestas wind turbines across 4,500ha, as well as the construction of 38km of transmission lines and a new substation.
Challenges faced :
JWA provided over 11,000 sqm of temporary roadway and hardstands, including 2.5 linear kilometers of Dura-Base Composite Mats.
Dura-Base when interlocked, form a continuous stable surface to maximise work safe ground conditions while minimising impact to the environment.
Benefits: