Dragline MoveThe 3,200T Marion 8050 dragline was scheduled to travel for four months through the rugged outback terrain in regional Queensland, Australia.
Weatherford Rig 807 Heavy LiftDuraBase oilfield mat was used to create a safe work platform for Weathford's Rig 807 for their drilling operations in India.