Sakhalin Island Heavy LiftDuraBase was deployed extensively across sandy terrain from the beachfront through to the LNG plant location providing many years of dependable platforms during the lengthy build phase.
Dragline MoveThe 3,200T Marion 8050 dragline was scheduled to travel for four months through the rugged outback terrain in regional Queensland, Australia.
railwayQueensland RailUrgently needed and time restricted, emergency access was required for a 450-tonne crane to enter a rain-affected site.