Lighting experts GM Poles were tasked with the supply and installation of lighting upgrades for City of Gold Coasts' Miami Aquatic Centre.
The challenge?
Dura-Base Composite Mats ticked all the boxes and more.
Made of hardwearing HDPE, the mats provided a worry-free site access for their 33 tonne Hitachi Zaxis. The mats were interlocked together, removing the risk of shifting and gaps appearing during use.
Unlike thinner hardscape protection matting, the 105mm thick Dura-Base provided the maximum load spread required to protect the buried services from their piling works. This meant they did not need to bring in any additional fill or crush rock for padding, taking away the messy handling of dusty materials.
See the action here:
Having site access challenges? Our experienced team are standing by for an obligation-free discussion.
Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.