Lighting experts GM Poles were tasked with the supply and installation of lighting upgrades for City of Gold Coasts' Miami Aquatic Centre. 

The challenge? 

  • Getting heavy steel tracked equipment across concrete flooring.
  • Protecting underground high pressure water pipes and water tanks. 
  • Minimise dust as pools were kept open to public during construction.

Dura-Base Composite Mats ticked all the boxes and more.

Made of hardwearing HDPE, the mats provided a worry-free site access for their 33 tonne Hitachi Zaxis. The mats were interlocked together, removing the risk of shifting and gaps appearing during use.

Unlike thinner hardscape protection matting, the 105mm thick Dura-Base provided the maximum load spread required to protect the buried services from their piling works. This meant they did not need to bring in any  additional fill or crush rock for padding, taking away the messy handling of dusty materials.

See the action here:

 

Having site access challenges? Our experienced team are standing by for an obligation-free discussion.

Enquire now

Case Study Attributes

Project Name
GM Poles Lighting Installation
industry
Council Works
Location
Miami, QLD
applications used
Underground Service Protection, Hardscape Protection
  • Installing Hardscape Protection Matting
    prevInstalling Hardscape Protection Matting next
  • Access Matting for 33 Tonne Excavator
    prevAccess Matting for 33 Tonne Excavator next
  • DuraBase Composite Mats Protecting Underground Services and Concrete Surface
    prevDuraBase Composite Mats Protecting Underground Services and Concrete Surfacenext
  • Hardscape Protection Mats for Council Pool Lighting Upgrades
    prevHardscape Protection Mats for Council Pool Lighting Upgradesnext
  • Construction Mats Used For Drilling with 33 Tonne Excavator
    prevConstruction Mats Used For Drilling with 33 Tonne Excavatornext
  • Hardscape Protection Mats for Dust Suppression
    prevHardscape Protection Mats for Dust Suppressionnext

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto