Julia Creek Project - Urgent Access Rail Mats

Julia Creek Project - Urgent Access Rail Mats
Julia Creek Project - Urgent Access Rail Mats
27 JAN 2022

Over 5km of Dura-Base composite mats were sent out for the repair works at the critical mining supply line. Watch the video here.

Flashback: This time 3 years ago, we assisted with emergency rail recovery works and repair operations at Julia Creek and Nelia on the Mt Isa Line with over 5 kilometres of Dura-Base Heavy Duty Access Mats. 

Dura-Base Mats allowed inspection and repair crews access flood-affected sites sooner by rapidly forming interlocked roadways. This provided stable access over saturated grounds for heavy lift cranes, excavators, trucks and more, with minimal impact to the environment.

Click here to watch footage from the Julia Creek recovery operations. To find out more, call our experienced team on 1800 264 628.
 

Railway Mats for Dual Crane Lift at Julia Creek

Social MediaSHARE
Back To News

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto