FODS Rumble Grid Mats

FODS Rumble Grid Mats

FODS Rumble Grid Mats

Dimensions: 3.658m (L)

                            2.134m (W)

                            95mm (H) - Pyramid height 73mm

Weight:           195 kg

Load rating:  80 tonnes

Benefits

  • Remove and collect worksite debris from tyres
  • Proprietary design deforms tyres without causing damage, making mud and debris fall off
  • 30min rapid installation with minimal ongoing maintenance
  • No digging of trenches required, such as sediment traps for traditional rumble grids
  • Reusable - after cleaning, FODS Rumble Grid Mats are ready for your next worksite - saving you time and money
  • FODS are effective on any soil type, making it the most adaptable rumble pad solution
  • Made from a durable and flexible polymer to handle heavy tyred machinery
  • FODS Rumble Grids are small enough to transport on a trailer and are joined together by hand on-site
  • Protects the ground from machinery reducing the need to re-turf at project completion
  • Environmentally friendly product- reusable and made from a 100% recyclable polymer

Videos

OVERVIEW OF THE FODS TRACKOUT SOLUTION

Benefits of FODS Reusable Rumble Mats on Australian Construction Sites
 

FODS TRACK OUT CONTROL MATS IN NORTH BRISBANE

Installation of mud shaker mats off busy Brisbane roadworks site with no digging required.

Case Study

FODS Melbourne Trials

FODS Melbourne Trials

30 days, 5 sites, 2 major projects - Melbourne Metro Tunnel and West Gate Tunnel Project.
 

Useful Links and Documents

FODS iSupply Listing

FODS iSupply Listing
 

FODS Brochure

FODS Brochure
 

FODS Engineering Data Sheet

FODS Engineering Data Sheet
 

  • Debris collected by FODS rumble mats
    prevDebris collected by FODS rumble matsnext
  • Washable mats vs rock pad needing replacements
    prevWashable mats vs rock pad needing replacementsnext
  • Official load rating of 80 tonnes
    prevOfficial load rating of 80 tonnesnext
  • High visibility site entrance
    prevHigh visibility site entrancenext
  • Reusable Track Out Control
    prevReusable Track Out Controlnext
  • Rapid Installation
    prevRapid Installationnext
  • FODS at a Wheel Wash Facility
    prevFODS at a Wheel Wash Facilitynext
  • No dig solution for concrete grounds
    prevNo dig solution for concrete groundsnext
  • FODS mats in place after steel grates
    prevFODS mats in place after steel gratesnext
  • FODS at West Gate Tunnel Project
    prevnext

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto