Wheatstone

Wheatstone

The job required geotechnical drilling for over 12 months. The all terrain vehicles that were supposed to be the solution and gain access to the site were quickly becoming bogged in the soft ground conditions. The soil contained acid sulphate soils which corroded the heavy machinery. 

Enquire now

Case Study Attributes

industry
Oil and Gas
Location
Onslow, WA
applications used
Geotechnical Drilling, Soft Ground Access
  • Geotechnical drilling in swampy ground conditions
    prevnext
  • Marsh temporary access using interlocking bog mats
    prevnext
  • Geotechnical drilling rig in marshland
    prevnext

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto