Substation Works

Substation Works

Temporary Ground Improvement with Composite Piling Mats

JWA safely delivered Dura-Base Composite Matting as the solution for our client’s objective of rebuilding a substation site without major resurfacing works.

Challenges: 

  • High-voltage environment
  • Heavy rainfall on-site with a sandy clay subsurface

Benefits of Composite Matting:

  • On-demand stabilisation for 30t piling rig (SR30)
  • Reusable platforms supporting multiple piling locations
  • Weatherproof
  • Preservation of existing surface
  • Eliminate the need for lengthy ground preparations and remediations 
Enquire now

Case Study Attributes

Project Name
Substation Rebuild
industry
Utilities
Location
Gin Gin, QLD
applications used
Piling Platform, Wet Weather Mitigation
  • prevnext
  • prevnext
  • prevnext

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto