A leader in urban landscape for over 40 years, our client was tasked with a construction job to build a 167m boardwalk over a seasonal wetlands lake.

The project is centred in a new housing development in the southeastern Melbourne suburbs of Clyde North. The large scale civil landscaped area would serve to provide local residents with access to the created environmental wetlands for recreation and enjoyment; provide a natural ecological habitat for local flora and fauna and serve to manage rainwater runoff from the surrounding streets.

To construct the boardwalk, several concrete piers needed to be poured on-site. In order to gain access to the seasonal lake/marsh bed, the water had to be isolated and drained from the work area.

Following this, the ground needed to be made competent to proceed with the construction.

 

Enquire now

Case Study Attributes

industry
Building
Location
Clyde North, VIC
applications used
Boardwalk Access, Soft Ground Access
  • Access into a lake bed
    prevnext
  • Temporary path into lake using bog mats
    prevnext
  • DuraBase mats resting on water bed for temporary access
    prevnext
  • Mangrove Boardwalk Construction Access Matting
    prevnext

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto