Pipeline Access at Connections Project

The Connections Project is the largest irrigation modernisation project in Australia and is funded by the Victorian Government. Valued at 2 billion dollars, the project sets out to ensure the sustainable future of productive agriculture. The project saves water by creating a world leading delivery system to boost productivity and foster healthy waterways. Furthermore, once the channels that caused leakage and evaporation are upgraded, it is estimated that there will be an annual water saving of 429 gigaliters.

Exposed to the harsh Australian sun, the open water channels were evaporating at a rapid rate. The solution was to replace these channels with underground pipes. The channels were drained, backfilled with soil and trenched for the pipeline installation. Excavation occurred for the primary purpose of laying the pipelines and once dug, the pipeline would sit flush underground. Problems were made apparent after the unexpected rain had left the already unstable foundation wet and boggy. Due to this, the excavator was unable to dig a trench as the soft soil caused havoc to its tracks.

How Dura-Base Mats Were Used

Dura-Base mats were placed along the trenching route for the excavator to have a stable roadway to dig a trench for the pipeline. The Dura-Base mats interlocked together continuously and were used to combat hidden bog pits. Perfect for reclaiming water channels; the mats could be picked up and used multiple times. The sturdy mats are 105mm thick and were environmentally friendly for the nearby grasslands. The alternative to using the mats was to use multiple trucks to distribute crushed rock, thereby increasing traffic to the site.

Although ongoing, this project is first in class for irrigation modernisation. The community of farmers and the future generation are all benefiting from this project as this retention program is saving copious amounts of water. With such an important step for the community the irrigator had this to say:

Every drop of water we’ve got, we’re going to have to make it count. It’s a short commodity; therefore you’ve got to make use of technology.

— Russell Pell

 

Enquire now

Case Study Attributes

Project Name
Connections Project
industry
Utilities
Location
Cohuna, VIC
applications used
Wet Weather Mitigation, Soft Ground Access
  • Pipeline connection
    prevPipeline connectionnext
  • DuraBase installation for irrigation works
    prevDuraBase installation for irrigation worksnext
  • Pipeline in swampy conditions
    prevPipeline in swampy conditionsnext

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto