Brisbane Airport New Runway

Brisbane Airport New Runway

Installation of HIAL runway lights


Construction of Brisbane Airport's New Runway included installation of HIAL runway lights. Dura-Base mats were used as the piling platform for the 280 tonne crane with a vibro-hammer.

Enquire now

Case Study Attributes

Project Name
Brisbane Airport New Runway
industry
Aviation
Location
Brisbane, QLD
applications used
Piling Platform, Wet Weather Mitigation
  • Setting up of 280t crane on DuraBase Mats
    prevSetting up of 280t crane on DuraBase Matsnext
  • Piling Platform with DuraBase Mats
    prevPiling Platform with DuraBase Matsnext
  • Composite Mats - Temporary Piling Platform
    prevComposite Mats - Temporary Piling Platformnext
  • Weather Proof Piling Platform with DuraBase Composite Mats
    prevWeather Proof Piling Platform with DuraBase Composite Matsnext

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • CPB
  • John Holland
  • Queensland Rail
  • Powerlink
  • Level Crossing Removal Project
  • Commonwealth Games 2018
  • WCnnx
  • WestGateTunnelProject
  • Santos
  • Chevron
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • Woodside
  • Spiecapag
  • RioTinto