APLNG

APLNG

14 months of geotecnical investigations in extremely sloppy ground conditions was often times in the range of single digit kPa. The project spanded across all seasons including the wet season and key challenges included tidal fluctauations and variations on the daily.

DuraBase mats were able to create firm platform for geotechnical drilling rigs to get access into the extremely soft soils. Over 100 core penetration tests they need to relocate and reposition the mats frequently.

Enquire now

Case Study Attributes

industry
Oil and Gas
applications used
Geotechnical Drilling, Soft Ground Access
  • Temporary access for trucks
    prevTemporary access for trucksnext
  • Pathway to drilling rig
    prevPathway to drilling rignext
  • DuraBase matting curved
    prevDuraBase matting curved next

How can we help you?

Talk to one of our experienced team about your project needs. Whether it is to review ground conditions, load capacities or just after a quote, click here and our team will be in touch.

Enquire now

Our Clients and Major Projects

  • Santos
  • Chevron
  • John Holland
  • Exxon Mobil
  • Origin
  • Arrow Energy
  • QGC
  • Schlumberger
  • Oil Search
  • Weatherford
  • CPB
  • Woodside
  • Spiecapag
  • RioTinto
  • Petrom
  • Reliance
  • Saipem
  • Commonwealth Games 2018
  • APLNG
  • WestConnex